§ 7-2. Construction of sidewalk ramps.  


Latest version.
  • As of January 15, 2004 any plans for construction of new sidewalk ramps shall include provisions for the new standards.

    The new standards are that the area of the ramp shall include detectable warnings in the form of truncated domes and the ramp shall be constructed of integrally colored concrete (all other requirements listed in the Standard Specifications for Road and Bridge Construction shall remain the same).

(Ord. No. 3-2004, §§ I, II, 1-6-2004)